Food & Beverage42,000 sq ft facility14-week build

Bottling line SCADA retrofit

Client objective: replace an end-of-life HMI fleet and eliminate undocumented PLC logic causing unplanned stops across three bottling lines.

Solution: re-engineered PLC logic on TIA Portal, deployed redundant Ignition SCADA servers, added OEE dashboards tied to line-level historian data.

+18%
OEE
−42%
Unplanned downtime
3wk
Faster fault diagnosis
OEE_TREND.LOG
79% UPTIME GAIN
Water Utility11 pump stationsMunicipal

Regional pump station network

Client objective: unify 11 disparate, radio-linked pump stations into a single SCADA view for a municipal water authority running on aging RTUs.

Solution: deployed standardized RTU hardware, redundant cellular/radio failover network, and a centralized SCADA historian with automated compliance reporting.

11→1
Unified control view
−61%
Truck rolls / month
100%
Reporting compliance
PharmaceuticalsGMP facility21 CFR Part 11

Validated batch control system

Client objective: implement a validated, audit-ready batch control system for a new tablet coating line ahead of an FDA pre-approval inspection.

Solution: designed and validated PLC/SCADA batch sequencing with full electronic record-keeping, e-signatures, and audit trail per 21 CFR Part 11.

0
Audit findings
−35%
Batch record time
9wk
To validated go-live
BATCH_SEQ_07 — STAGE 3/5 ✓ E-SIGNATURE LOGGED